PARK HIGHLIGHTS
- 10 – 82 Acres
-
Front park rear load and cross dock configurations available
-
BTS sites available up to 702,000 SF (Parcel 6) or 1,209,000 SF (Parcel 10)
-
Mill levy – 147 mills
UTILITIES PARCEL 6 PARCEL 10 Current Project Status: Shovel Ready Shovel Ready Building Size: Up to 700K SF Up to 1.2 Million SF Site Acreage: 84 Acres 72.4 Acres Electric Provider: Xcel Energy Xcel Energy Current Power to Site 13.2 KV (AMPS) 13.2 KV (AMPS) Future Transmission Service Available: 230 KV (MW) 230 KV (MW) Substation Source: High Point High Point Water Provider: Aurora Water Aurora Water Current Water Availability: 24” Main 24” Main Wastewater Capacity: 30” Main Within 2nd Creek 30” Main Within 2nd Creek
T.J. Smith, SIOR
+1 303 283 4576
tj.smith@colliers.com
Nick Rice
+1 720 833 4620
nick.rice@colliers.com
Riggs Winz
+1 303 283 4571
riggs.winz@colliers.com


